This project included a concrete encasement for a ductbank, 300 PSI, slurry backfill 50-150 PSI. conduit, fittings, pullbox installation, A/C replacement and a 5,400 foot trench. When the job was completed, 23 miles of distribution lines, 452 light poles and 1135 lights were installed.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
2008
Turnberry Associates-CENTRA SUB
Design-Bid-Build
Marnell Corrao Associates
Las Vegas, NV